Installation notes solenoid valve

Jan 18, 2024

Leave a message

Installation notes solenoid valve
1. When installing, please note that the arrow on the valve body should be consistent with the flow direction of the medium. Do not install in places with direct dripping or splashing water. The solenoid valve should be installed vertically upward;
2. The solenoid valve should ensure normal operation within the power supply voltage fluctuation range of 15%-10% of the rated voltage;
3. After the solenoid valve is installed, there must be no reverse pressure difference in the pipeline. And it needs to be powered on several times to make it suitable for temperature before it can be officially put into use;
4. The pipeline should be thoroughly cleaned before installing the solenoid valve. The incoming medium should be free of impurities. Filter installed in front of valve;
5. When the solenoid valve fails or is cleaned, a bypass device should be installed to ensure that the system continues to operate.

Send Inquiry